Managing Logical Clusters

Editing a Logical Cluster

Precautions

Procedure

  1. Log in to the GaussDB(DWS) console. In the navigation pane, choose Clusters > Dedicated Clusters.
  2. In the cluster list, click the name of the target cluster. The Cluster Information page is displayed.
  3. In the navigation pane, choose Logical Clusters and click Edit in the Operation column of the target cluster.

  4. Add a node to the logical cluster by moving the selected ring from the right to the left, or remove a node from the logical cluster by moving the selected ring from the left to the right, and click OK.
  5. When adding a node, select online or offline scale-out as needed.

Managing Resources (in a Logical Cluster)

Precautions

The original resource pool configuration is cleared when the cluster is converted from physical to logical. You have to add the resource pool again if you want to configure it after the conversion.

Procedure

  1. Log in to the GaussDB(DWS) console. In the navigation pane, choose Clusters > Dedicated Clusters.
  2. In the cluster list, click the name of the target cluster. The Cluster Information page is displayed.
  3. In the navigation pane, choose Logical Cluster Management. In the Operation column of a logical cluster, click Resource Management Configurations. On the displayed page, you can manage resources in a logical cluster. For details, see Resource Management.

Restarting Logical Clusters

  1. Log in to the GaussDB(DWS) console. In the navigation pane, choose Clusters > Dedicated Clusters.
  2. In the cluster list, click the name of the target cluster. The Cluster Information page is displayed.
  3. In the navigation pane on the left, switch to the Logical Clusters page, locate the row that contains the logical cluster to be restarted, and click More > Restart in the Operation column.
  4. Confirm that all information is correct and click OK.

Scaling Out a Logical Cluster

Prerequisites

Procedure

  1. Log in to the GaussDB(DWS) console. In the navigation pane, choose Clusters > Dedicated Clusters.
  2. On the displayed Clusters page, choose More > Scale Node > Scale Out.
  3. On the scale-out page, select a logical or elastic cluster.

    Clusters of version 8.2.1.100 and later support job termination.

Scaling In a Logical Cluster

Constraints

Procedure

  1. Log in to the GaussDB(DWS) console. In the navigation pane, choose Clusters > Dedicated Clusters.
  2. In the cluster list, click the name of the target cluster. The Cluster Information page is displayed.
  3. In the navigation pane on the left, switch to the Logical Clusters page. Locate the row that contains the target elastic pool and click Edit in the Operation column to delete nodes from the elastic pool (move the selected ring from the left to the right).

  4. Click OK.