Precautions
Procedure
Precautions
The original resource pool configuration is cleared when the cluster is converted from physical to logical. You have to add the resource pool again if you want to configure it after the conversion.
Procedure
Prerequisites
Procedure
Clusters of version 8.2.1.100 and later support job termination.

Constraints
Procedure