If the scheduling calendar function is used, the system checks whether the planned execution time of a job instance is a working day during data job scheduling or patching.
This function is available for batch processing jobs but not for real-time processing jobs.

Set Calendar Name, Default Working Days, and Description.
You can select Mon to Fri or Mon to Sun for Default Working Days. By default, Mon to Fri is selected.
After creating the calendar, you can use it for jobs. Go to the DataArts Factory console, open a job, click Scheduling Setup, select Run periodically for Scheduling Type, and select the calendar you have created for Scheduling Calendar. A dry run is performed beyond the calendar, and the job is executed normally within the calendar range.
