By configuring a task group, you can control the maximum number of concurrent nodes in a task group in a more fine-grained manner.
Parameter |
Description |
|---|---|
Task Group Name |
Name of the task group. It must be unique. |
Maximum number of concurrency |
Maximum number of concurrent job nodes in the current task group The maximum number of concurrent nodes is the current number of concurrent DataArts Studio instances. The value cannot exceed the maximum number of concurrent nodes of the DataArts Studio instance, which is 1,000. The maximum number of concurrent nodes varies depending on the DataArts Studio instance specifications. |
Description |
Description of the task group |
After the task group is created, go to the job development page. On the canvas of a job, click Scheduling Setup and select the created task group. Then the number of concurrent nodes in the current task group can be controlled in a more fine-grained manner based on the selected task group.
Modifying a task group: Locate a task group and click Modify in the Operation column. The modification takes effect immediately.
Deleting a task group: Locate a task group and click Delete in the Operation column. A task group used by a job cannot be deleted.
Viewing references: Locate a task group and click View Reference in the Operation column to view the jobs that are using the task group.