forked from docs/doc-exports
Reviewed-by: gtema <artem.goncharov@gmail.com> Co-authored-by: Hasko, Vladimir <vladimir.hasko@t-systems.com> Co-committed-by: Hasko, Vladimir <vladimir.hasko@t-systems.com>
4.4 KiB
4.4 KiB
Configuring Versioning
Procedure
- In the bucket list, click the bucket you want to operate. The Overview page of the bucket is displayed.
- In the Basic Information area, move the cursor over Disabled, Suspended, or Enabled next to Versioning. The Edit button is displayed next to the versioning status. Click Edit. The dialog box for editing the versioning status is displayed.
- Select Enable. For details, see Figure 1.
- Click OK to enable versioning for the bucket.
- Click an object to go to the object details page. On the Versions tab, view all versions of the object.
Related Operations
After versioning is enabled, on the object details page that is displayed, click Versions, and then you can delete and download versions of the object.
- In the bucket list, click the bucket you want to operate. The Overview page of the bucket is displayed.
- In the navigation pane, click Objects.
- In the object list, click the object you want to go to the object details page.
- On the Versions tab, view all versions of the object.
- Perform the following operations on object versions:
- Download a desired version of the object by clicking Download in the Operation column.
- Delete a version of the object by clicking Delete in the Operation column. If you delete the latest version, the most recent version becomes the latest version.
Parent topic: Versioning