forked from docs/doc-exports
Reviewed-by: Pruthi, Vineet <vineet.pruthi@t-systems.com> Reviewed-by: Rechenburg, Matthias <matthias.rechenburg@t-systems.com> Co-authored-by: Lu, Huayi <luhuayi@huawei.com> Co-committed-by: Lu, Huayi <luhuayi@huawei.com>
12 KiB
12 KiB
Managing Resource Management Plan Stages
Prerequisites
Adding a Resource Management Plan Stage
- Log in to the GaussDB(DWS) management console.
- Choose Clusters. Click the name of a cluster.
- Choose Resource Management Configurations.
- Go to the plan details page and click Add in the Plan stage area. On the Add Stage page, enter the stage name and configure the resource information. Confirm the configuration and click OK.
Modifying a Resource Management Plan Stage
- Log in to the GaussDB(DWS) management console.
- Choose Clusters. Click the name of a cluster.
- Choose Resource Management Configurations.
- Go to the plan details page and click Modify in the Operation column of the target plan stage.
- Modify parameters, such as the stage changing time and resource configurations.
Manually Changing the Resource Management Plan Stage
If a running plan needs to be switched to a stage in advance, you can manually do it.
Deleting a Resource Management Plan Stage
Parent topic: Resource Management Plan