forked from docs/doc-exports
Reviewed-by: Pruthi, Vineet <vineet.pruthi@t-systems.com> Co-authored-by: chenxiaoxiong <chenxiaoxiong@huawei.com> Co-committed-by: chenxiaoxiong <chenxiaoxiong@huawei.com>
8.3 KiB
8.3 KiB
Configuring the Number of Concurrently Running Nodes
This section describes how to configure the maximum number of job nodes that can run concurrently in a workspace.
Constraints
The number of concurrently running nodes in the workspace cannot exceed that in the instance.
Procedure
- Log in to the DataArts Studio console by following the instructions in Accessing the DataArts Studio Instance Console.
- On the DataArts Studio console, locate a workspace and click DataArts Factory.
- In the navigation pane, choose .
- Choose Nodes Concurrently Running.
- Set Nodes Concurrently Running in the Workspace. Ensure that the value is less than or equal to the maximum number of nodes that can run concurrently in the DataArts Studio instance.
Table 1 lists the maximum number of nodes that can run concurrently in the DataArts Studio instance. To view the quota of the job node scheduling times per day, click More of a DataArts Studio instance and select Quota Usage.
- Click Save.
Parent topic: Configuring Resources

