Files
doc-exports/docs/opengauss/umn/opengauss_01_0076.html
Ru, Li Yi 0b0c254b4c gaussdb_umn_1128
Reviewed-by: Wagner, Fabian <fabian.wagner@t-systems.com>
Co-authored-by: Ru, Li Yi <liyiru7@huawei.com>
Co-committed-by: Ru, Li Yi <liyiru7@huawei.com>
2025-01-13 14:51:57 +00:00

4.6 KiB

Viewing a Task

You can view the progresses and results of tasks on the Task Center page.

You can view and manage the following tasks:

  • Creating a DB instance
  • Creating a manual backup
  • Restoring to a new DB instance
  • Adding nodes
  • Scaling up storage space
  • Adding shards
  • Adding coordinator nodes
  • Deleting a DB instance

Procedure

  1. Log in to the management console.
  2. Click in the upper left corner and select a region and project.

  3. Click in the upper left corner of the page and choose Databases > GaussDB. The GaussDB console is displayed.

  4. Choose Task Center in the navigation pane on the left. On the displayed page, view the task details.

    • To identify the task, you can use the task name/ID or instance name/ID, or simply select the task type in the search box in the upper right corner.
    • You can click in the upper right corner to view the progress and status of tasks in a specific period. The default period is seven days.

      The task list can only show up to 30 days of past tasks.

    • You can view tasks in the following statuses:
      • Running
      • Completed
      • Failed