forked from docs/doc-exports
Reviewed-by: Wagner, Fabian <fabian.wagner@t-systems.com> Co-authored-by: Ru, Li Yi <liyiru7@huawei.com> Co-committed-by: Ru, Li Yi <liyiru7@huawei.com>
4.6 KiB
4.6 KiB
Viewing a Task
You can view the progresses and results of tasks on the Task Center page.
You can view and manage the following tasks:
- Creating a DB instance
- Creating a manual backup
- Restoring to a new DB instance
- Adding nodes
- Scaling up storage space
- Adding shards
- Adding coordinator nodes
- Deleting a DB instance
Procedure
- Log in to the management console.
- Click
in the upper left corner and select a region and project.
- Click
in the upper left corner of the page and choose Databases > GaussDB. The GaussDB console is displayed.
- Choose Task Center in the navigation pane on the left. On the displayed page, view the task details.
- To identify the task, you can use the task name/ID or instance name/ID, or simply select the task type in the search box in the upper right corner.
- You can click
in the upper right corner to view the progress and status of tasks in a specific period. The default period is seven days.The task list can only show up to 30 days of past tasks.
- You can view tasks in the following statuses:
- Running
- Completed
- Failed
Parent topic: Task Center