forked from docs/doc-exports
Reviewed-by: Hasko, Vladimir <vladimir.hasko@t-systems.com> Co-authored-by: 陈伟 00621181 <chenwei395@huawei.com> Co-committed-by: 陈伟 00621181 <chenwei395@huawei.com>
4.1 KiB
4.1 KiB
Creating an Execution Plan
- Log in to the management console.
- In the upper left corner of the page, click
, and then click Management & Deployment > Resource Formation Service.
- In the left navigation pane, choose Stacks.
- To create an execution plan for an existing stack, you can use either of the following ways:
- Go to the stack list page, locate the target stack, and click Update in the Operation column.
- Alternatively, go to the stack details page and click Update Template/Parameter in the upper right corner.
The subsequent steps are same as those in Updating the Stack Template or its Parameters, except that you need to click Create Execution Plan instead of Directly Deploy Stack in the Confirm Configurations step.
Then, an execution plan is generated, but the stack is not directly deployed. If you create multiple execution plans, they will exist in the same stack, as shown in Figure 4.
Parent topic: Creating, Deploying and Deleting an Execution Plan



