forked from docs/doc-exports
Reviewed-by: Pruthi, Vineet <vineet.pruthi@t-systems.com> Co-authored-by: chenxiaoxiong <chenxiaoxiong@huawei.com> Co-committed-by: chenxiaoxiong <chenxiaoxiong@huawei.com>
2.5 KiB
2.5 KiB
Why Is There No Job Running Scheduling Log on the Monitor Instance Page After Periodic Scheduling Is Configured for a Job?
Possible Causes
Why Is There No Job Running Scheduling Log on the Monitor Instance Page After Periodic Scheduling Is Configured for a Job? This job has not been started or the job on which this depends has not been executed.
Solution
- On the DataArts Factory page, choose to check whether the target job is being scheduled. A job can be scheduled only within the scheduling period.
- If a job depends on other jobs, choose to view the running status of the dependent jobs. If the job is self-dependent, expand the search time to check whether the job is waiting for running due to the failure of a historical job instance.
Parent topic: DataArts Factory
