Files
doc-exports/docs/cce/umn/cce_faq_00012.html
qiujiandong1 71d5c814e7 CCE UMN 20250311 version
Reviewed-by: Eotvos, Oliver <oliver.eotvos@t-systems.com>
Co-authored-by: qiujiandong1 <qiujiandong1@huawei.com>
Co-committed-by: qiujiandong1 <qiujiandong1@huawei.com>
2025-06-16 14:58:53 +00:00

1.4 KiB

What Should I Do If a Workload Is Stopped Caused by Pod Deletion?

Symptom

A workload is in Stopped state.

Possible Cause

The metadata.enable field in the YAML file of the workload is false. As a result, the pod of the workload is deleted and the workload is in the stopped status.

Solution

Delete the enable field or set it to true.