Files
doc-exports/docs/dataartsstudio/umn/dataartsstudio_03_0042.html
chenxiaoxiong f9e2808b7c DataArts UMN 20250810 version
Reviewed-by: Pruthi, Vineet <vineet.pruthi@t-systems.com>
Co-authored-by: chenxiaoxiong <chenxiaoxiong@huawei.com>
Co-committed-by: chenxiaoxiong <chenxiaoxiong@huawei.com>
2025-09-02 10:44:13 +00:00

18 lines
1.6 KiB
HTML

<a name="dataartsstudio_03_0042"></a><a name="dataartsstudio_03_0042"></a>
<h1 class="topictitle1">Will Subsequent Jobs Be Affected If a Job Fails to Be Executed During Scheduling of Dependent Jobs? What Should I Do?</h1>
<div id="body8662426"><div class="section" id="dataartsstudio_03_0042__section17310310103116"><h4 class="sectiontitle">Possible Causes</h4><p id="dataartsstudio_03_0042__p13327616163113">One of the jobs that depend on each other fails during scheduling.</p>
</div>
<div class="section" id="dataartsstudio_03_0042__section312172614311"><h4 class="sectiontitle">Solution</h4><p id="dataartsstudio_03_0042__p199123923112">The subsequent jobs may be suspended, continued, or canceled, depending on the configuration.</p>
<div class="fignone" id="dataartsstudio_03_0042__fig991339173112"><span class="figcap"><b>Figure 1 </b>Job dependencies</span><br><span><img id="dataartsstudio_03_0042__image81013918319" src="en-us_image_0000002269195897.png"></span></div>
<p id="dataartsstudio_03_0042__p51083912315"></p>
<p id="dataartsstudio_03_0042__p9108393316">In this case, do not stop the job. You can rerun the failed job instance or stop the abnormal instance and then run it again. After the instance failure is removed, the subsequent operations will continue. If you manually process the failure not in DataArts Factory but in other ways, you can force the job instance to succeed after the failure is removed and then subsequent jobs will continue to run properly.</p>
</div>
</div>
<div>
<div class="familylinks">
<div class="parentlink"><strong>Parent topic:</strong> <a href="dataartsstudio_03_0035.html">DataArts Factory</a></div>
</div>
</div>