Files
doc-exports/docs/dataartsstudio/umn/dataartsstudio_01_1283.html
chenxiaoxiong f9e2808b7c DataArts UMN 20250810 version
Reviewed-by: Pruthi, Vineet <vineet.pruthi@t-systems.com>
Co-authored-by: chenxiaoxiong <chenxiaoxiong@huawei.com>
Co-committed-by: chenxiaoxiong <chenxiaoxiong@huawei.com>
2025-09-02 10:44:13 +00:00

34 lines
7.3 KiB
HTML

<a name="dataartsstudio_01_1283"></a><a name="dataartsstudio_01_1283"></a>
<h1 class="topictitle1">Configuring a Scheduling Calendar</h1>
<div id="body0000001744199017"><ul id="dataartsstudio_01_1283__ul174614346453"><li id="dataartsstudio_01_1283__li7471934194514">You can configure a scheduling calendar and specify the working days for scheduling a job.</li><li id="dataartsstudio_01_1283__li4472345451">After creating a scheduling calendar, you can go to the DataArts Factory console, open a job, click <strong id="dataartsstudio_01_1283__b135501231213">Scheduling Setup</strong>, select <strong id="dataartsstudio_01_1283__b205505239211">Run periodically</strong> for <strong id="dataartsstudio_01_1283__b175506235219">Scheduling Type</strong>, and select the calendar you have created for <strong id="dataartsstudio_01_1283__b35501323142110">Scheduling Calendar</strong>. <strong id="dataartsstudio_01_1283__b151766122566">A dry run is performed beyond the calendar, and the job is executed normally within the calendar range.</strong><div class="note" id="dataartsstudio_01_1283__note5326143711464"><img src="public_sys-resources/note_3.0-en-us.png"><span class="notetitle"> </span><div class="notebody"><p id="dataartsstudio_01_1283__p1914415388468">If the scheduling calendar function is used, the system checks whether the planned execution time of a job instance is a working day during data job scheduling or patching.</p>
<ul id="dataartsstudio_01_1283__ul1141912514476"><li id="dataartsstudio_01_1283__li18420425164716">If the planned execution time of the instance is a working day in the calendar, the instance is executed normally.</li><li id="dataartsstudio_01_1283__li17420172584715">If the planned execution time of the instance is not a working day in the calendar, a dry run is performed.</li></ul>
</div></div>
</li></ul>
<div class="section" id="dataartsstudio_01_1283__section15301649455"><h4 class="sectiontitle">Constraints</h4><p id="dataartsstudio_01_1283__p520313817455">This function is available for batch processing jobs but not for real-time processing jobs.</p>
</div>
<div class="section" id="dataartsstudio_01_1283__section16169135075112"><h4 class="sectiontitle">Procedure</h4><ol id="dataartsstudio_01_1283__en-us_topic_0175328117_ol82410082819"><li id="dataartsstudio_01_1283__li2848154165110"><span>Log in to the <span id="dataartsstudio_01_1283__en-us_topic_0000001987511677_en-us_topic_0000001127311125_text5574448155719">DataArts Studio</span> console by following the instructions in <a href="dataartsstudio_01_0001.html">Accessing the DataArts Studio Instance Console</a>.</span></li><li id="dataartsstudio_01_1283__li10888120591"><span>On the <span id="dataartsstudio_01_1283__en-us_topic_0181092879_text185611381448">DataArts Studio</span> console, locate a workspace and click <strong id="dataartsstudio_01_1283__en-us_topic_0181092879_b65382814249">DataArts Factory</strong>.</span></li><li id="dataartsstudio_01_1283__en-us_topic_0175328117_li52490192815"><span>In the left navigation pane, choose <strong id="dataartsstudio_01_1283__b106752029226">Configuration</strong> &gt; <strong id="dataartsstudio_01_1283__b16712093223">Configure</strong>.</span></li><li id="dataartsstudio_01_1283__en-us_topic_0175328117_li1224180202820"><span>Choose <strong id="dataartsstudio_01_1283__b12418133362218">Scheduling Calendars</strong>.</span></li><li id="dataartsstudio_01_1283__li4333358133919"><span>Click <strong id="dataartsstudio_01_1283__b54843245383137">Add</strong>. The <strong id="dataartsstudio_01_1283__b37540836583137">Create Scheduling Calendar</strong> dialog box is displayed.</span><p><div class="fignone" id="dataartsstudio_01_1283__fig1426191803416"><span class="figcap"><b>Figure 1 </b>Create Scheduling Calendar dialog box</span><br><span><img id="dataartsstudio_01_1283__image85011018195210" src="en-us_image_0000002269124977.png" title="Click to enlarge" class="imgResize"></span></div>
</p></li><li id="dataartsstudio_01_1283__li17861154617111"><span>Set parameters for the scheduling calendar.</span><p><p id="dataartsstudio_01_1283__p1881917691517">Set <strong id="dataartsstudio_01_1283__b3991186115913">Calendar Name</strong>, <strong id="dataartsstudio_01_1283__b18992961596">Default Working Days</strong>, and <strong id="dataartsstudio_01_1283__b49921467598">Description</strong>.</p>
<p id="dataartsstudio_01_1283__p116581854151514">You can select <strong id="dataartsstudio_01_1283__b4258183092717">Mon to Fri</strong> or <strong id="dataartsstudio_01_1283__b156109461279">Mon to Sun</strong> for <strong id="dataartsstudio_01_1283__b393364052818">Default Working Days</strong>. By default, <strong id="dataartsstudio_01_1283__b2991753162817">Mon to Fri</strong> is selected.</p>
</p></li><li id="dataartsstudio_01_1283__li461715251121"><span>Click <strong id="dataartsstudio_01_1283__b8666152516298">OK</strong>.</span><p><p id="dataartsstudio_01_1283__p6957181719550">After creating the calendar, you can use it for jobs. Go to the DataArts Factory console, open a job, click <strong id="dataartsstudio_01_1283__b74781526113119">Scheduling Setup</strong>, select <strong id="dataartsstudio_01_1283__b4971151733214">Run periodically</strong> for <strong id="dataartsstudio_01_1283__b1962411274323">Scheduling Type</strong>, and select the calendar you have created for <strong id="dataartsstudio_01_1283__b4455221173315">Scheduling Calendar</strong>. A dry run is performed beyond the calendar, and the job is executed normally within the calendar range.</p>
</p></li></ol>
</div>
<div class="section" id="dataartsstudio_01_1283__section13822175111232"><h4 class="sectiontitle">More Operations</h4><ul id="dataartsstudio_01_1283__ul8403151192418"><li id="dataartsstudio_01_1283__li140311116244">Modify a calendar: Click <strong id="dataartsstudio_01_1283__b6467162610348">Modify</strong> in the <strong id="dataartsstudio_01_1283__b146653014344">Operation</strong> column.<ul id="dataartsstudio_01_1283__ul66512714361"><li id="dataartsstudio_01_1283__li151725817356"><strong id="dataartsstudio_01_1283__b158150568344">Batch Select</strong>: Select all Mondays to Fridays of the current month.</li><li id="dataartsstudio_01_1283__li126178127367"><strong id="dataartsstudio_01_1283__b1783273323511">Invert Selection</strong>: Select all non-working days.</li><li id="dataartsstudio_01_1283__li1537816174369"><strong id="dataartsstudio_01_1283__b3635171143613">Clear</strong>: Clear selected working days.<div class="fignone" id="dataartsstudio_01_1283__fig18411027133116"><span class="figcap"><b>Figure 2 </b>Modifying a scheduling calendar</span><br><span><img id="dataartsstudio_01_1283__image1141152718314" src="en-us_image_0000002269124989.png" title="Click to enlarge" class="imgResize"></span></div>
<p id="dataartsstudio_01_1283__p136575483119"></p>
</li></ul>
</li><li id="dataartsstudio_01_1283__li651181314242">Delete a calendar: Click <strong id="dataartsstudio_01_1283__b14432121533716">Delete</strong> in the <strong id="dataartsstudio_01_1283__b11484520183710">Operation</strong> column.</li></ul>
</div>
</div>
<div>
<div class="familylinks">
<div class="parentlink"><strong>Parent topic:</strong> <a href="dataartsstudio_01_0510.html">Configuring Resources</a></div>
</div>
</div>
<script language="JavaScript">
<!--
initImageViewer('.imgResize');
var msg_imageMax = "view original image";
var msg_imageClose = "close";
//--></script>